Contents
1.1 Purpose of the Report
1.2 Structure of the Report
2.1 Background
2.2 General Site Description
2.3 Construction Activities
2.4 Project Organisation and Management Structure
2.5 Status of Environmental Approval Documents 4
3 Environmental Monitoring Requirement, environmental
Mitigation Measures
4 Implementation Status on Environmental Protection
Requirements
6.1 Weekly Site Audits
6.2 Landscape and Visual Audit
7 Environmental Non-conformance
7.1 Summary of Environmental Non-Compliance
7.2 Summary of Environmental Complaint
7.3 Summary of Environmental Summon and Successful
Prosecution
8.1 Key Issues for the Coming Month
8.2 Construction Programme
LIST OF TABLES
LIST OF ANNEXES
Annex A |
|
Annex B |
|
Annex C |
|
Annex D |
|
Annex E |
|
Annex F |
|
Annex G |
Environmental
complaint, Environmental Summons and Prosecution Log |
The construction works of No. EP/SP/61/10 Organic Waste
Treatment Facilities Phase I (the Project) commenced
on 21 May 2015. This is the 1st
monthly Environmental Monitoring and Audit (EM&A) report
presenting the EM&A works carried out during the period from 21 May 2015
to 30 June 2015 in accordance with the EM&A Manual.
Summary
of Construction Works undertaken during the Reporting Month
Works
undertaken in the reporting month included:
¡P
Open
cutting;
¡P
Pre-drilling;
and
¡P
Piling.
Environmental
Monitoring and Audit Progress
A
summary of the monitoring activities undertaken in this reporting period is
listed below:
¡P
Joint Environmental Site Inspection |
5 times |
¡P
Landscape & Visual Monitoring |
2 times |
Waste
Management
Waste
generated from this Project includes inert construction and demolition
(C&D) materials (public fill) and non-inert C&D materials (construction
wastes). In total, 2266.14 tonnes
of inert C&D material were generated from the Project. 2256.48 tonnes were
disposed as public fill. 9.66 tonnes of general refuse was disposed as
landfill. 0.00 kg of metals, 0.00 kg
of papers/ cardboard packing and 0.00 kg of plastics were
sent to recyclers for recycling during the reporting period.
Environmental
Site Inspection
Five
weekly joint environmental site inspections were carried out by the
representatives of the Contractor, SOR and the Environmental Team (ET). The IEC was also present at the joint inspection on 17 June 2015. Details
of the audit findings and implementation status of the mitigation measures are
presented in Section 6.1.
Landscape
& Visual
An onsite inspection on
landscape and visual mitigation measures was performed on 5 and 17 June 2015. Details of the audit findings and
implementation status of the mitigation measures are presented in Sections
6.2.
Environmental
Exceedance/Non-conformance/Compliant/Summons and Prosecution
No exceedance was recorded during the reporting
period.
No non-compliance event was recorded during the
reporting period.
No
environmental complaint and summon/prosecution was received in this reporting
period.
Future
Key Issues
Works
to be undertaken in the next reporting month include:
¡P
Piling;
¡P
Removing
Topsoil from Building 2; and
¡P
Foundation
Footing of Tower Crane.
Environmental
impacts arising from the above construction activities are mainly associated
with dust, construction noise, site runoffs, waste management and landscaping
issues.
ERM-Hong
Kong, Limited (ERM) was appointed by OSCAR Bioenergy Joint Venture (the
Contractor) as the Environmental Team (ET) to undertake the Environmental
Monitoring and Audit (EM&A) programme for the Contract No. EP/SP/61/10
of Organic Waste Treatment Facilities Phase I (the
Project).
This is the 1st EM&A
report which summarises the monitoring results and audit findings for the
EM&A programme during the reporting period from 21 May 2015 to 30 June
2015.
The
structure of the report is as follows:
Section
1: Introduction
It details the scope and
structure of the report.
Section 2: Project Information
It summarises the background and
scope of the Project, site description, project organization, construction programme,
construction works undertaken and status of the Environmental Permits
(EP)/licences over the construction phase of the Project.
Section 3: Environmental Monitoring
Requirements
It summarises the environmental
monitoring requirements including monitoring parameters, programmes,
methodologies, frequency, locations, Action and Limit Levels, Event/Action
Plans, environmental mitigation measures as recommended in the EM&A Manual
and approved EIA report.
Section 4: Implementation Status on Environmental Mitigation Measures
It summarises the implementation
of environmental protection measures during the reporting period.
Section 5: Waste Management
It summarises the quantity of
public fill and construction waste generated in the reporting period
Section 6: Environmental Site Inspection
It summarises the audit findings
of the weekly site inspections undertaken within the reporting period.
Section 7: Environmental Non-conformance
It summarises any exceedance of
environmental performance standard, environmental complaints and summons
received within the reporting period.
Section
8: Further Key Issues
It summarises the impact forecast
and monitoring schedule for the next reporting month.
Section
9: Conclusions
The Organic Waste Treatment Facilities
(OWTF) Phase I development (hereinafter referred to as ¡§the Project¡¦) is to
design, construct and operate a biological treatment facility with a capacity
of about 200 tonnes per day and convert source-separated organic waste from
commercial and industrial sectors (mostly food waste) into compost and biogas
through proven biological treatment technologies.
The environmental
acceptability of the construction and operation of the Project had been
confirmed by findings of the associated Environmental Impact Assessment (EIA)
Study completed in 2009. The
Director of Environmental Protection approved this EIA Report under the
Environmental Impact Assessment Ordinance (EIAO) (Cap. 499) in February 2010
(Register No.: AEIAR-149/2010) (hereafter referred to as the approved EIA Report). Subsequent Report on Re-assessment on
Environmental Implications and Report on Re-assessment on Hazard to Life
Implications were completed in 2013, respectively.
An
Environmental Permit (EP) (No. EP-395/2010) was issued by the Environmental Protection Department
(EPD) to the EPD, the Permit Holder, on 21 June 2010 and varied on 18 March
2013 (No. EP-395/2010/A) and 21 May 2013 (No. EP-395/2010/B),
respectively. The Design
Build and Operate Contract for the OWTF (Contract No. EP/SP/61/10 Organic Waste
Treatment Facilities Phase I (the Contract)) was awarded to SITA Waste Services
Limited, ATAL Engineering Limited and Ros-Roca, Sociedad Anonima jointly trading
as the OSCAR Bioenergy Joint Venture (OSCAR or the Contractor). A Further EP (No.
FEP-01/395/2010/B) was issued by the EPD to the OSCAR
on 16 February 2015.
Under
the requirements of Condition 5 of the EP (No. FEP-01/395/2010/B), an
Environmental Monitoring and Audit (EM&A) programme as set out in the
Agreement No. CE7/2008 (EP) EM&A Manual (hereinafter referred to as
EM&A Manual) is required to be implemented. ERM-Hong Kong, Ltd (ERM) has been
appointed by OSCAR as the Environmental Team (ET) to undertake the EM&A programme for the Contract.
The construction works commenced on 21 May 2015 and
are scheduled for completion by April 2017.
The
Project Site is located at Siu Ho Wan in North Lantau with an area of about 2
hectares. The
layout of the Project Site is illustrated in Annex A.
A
summary of the major construction activities undertaken in the reporting period
is shown in Table 2.1. The locations of the construction
activities are shown in Annex
B. The construction programme of the
Project is presented in Annex
C.
Table 2.1 Summary
of Construction Activities Undertaken in the Reporting Period
Construction Activities Undertaken |
¡P
Open cutting ¡P
Pre-drilling ¡P
Piling |
The
project organisation chart and contact details are shown in Annex D.
A
summary of the valid permits, licences, and/or notifications on environmental
protection for this Project is presented in Table 2.2.
Table 2.2 Summary
of Environmental Licensing, Notification and Permit Status
Permit/ Licences/ Notification |
Reference |
Validity Period |
Remarks |
Environmental Permit |
FEP-01/395/2010/B |
Throughout the Contract |
Permit granted on 16 February 2015 |
Notification of Construction Works under the Air
Pollution Control (Construction Dust) Regulation |
Ref No. 386715 |
Throughout the Contract |
- |
Water Discharge License |
WT00021482-2015 |
21 May 2015 ¡V 31 May 2020 |
- |
Construction Noise Permit |
GW-RW0078-15 |
1 April 2015 ¡V 30 August 2015 |
|
Chemical Waste Producer Registration |
WPN 5213-961-O2231-01 |
Throughout the Contract |
Licence approved on 29 April 2015 |
All the
relevant environmental mitigation measures listed in the EIA Report and
EM&A Manual are summarised in Annex E.
According
to the EM&A Manual and EP requirement, no air quality, noise and water
quality monitoring is required.
Bi-weekly
landscape and visual audit is required to ensure that the design,
implementation and maintenance of landscape and visual mitigation measures
recommended in the EIA Report are fully achieved.
The
Contractor has implemented environmental mitigation measures and requirements
as stated in the approved EIA Report and EM&A Manual. The implementation status of the
measures during the reporting period is summarised in Annex E.
Wastes
generated from this Project include inert construction and demolition (C&D)
materials (public fill) and non-inert C&D materials (construction
waste). Construction waste
comprises general refuse, metals and paper/cardboard packaging materials. Metals generated from the Project are
also grouped into construction waste as the materials were not disposed of with
others at public fill. Reference
has been made to the Monthly Summary Waste Flow Table prepared by the Contractor
(see Annex F).
With reference to the relevant handling records and trip tickets of this
Project, the quantities of different types of waste generated in the reporting
month are summarised in Table 5.1.
Table 5.1 Quantities
of Waste Generated from the Project
Month / Year |
Quantity |
|||
|
Total Inert C&D Materials Generated (a) |
Non-inert C&D Materials (b) |
||
C&D Materials Recycled (c) |
C&D Waste Disposed of at Landfill (d) |
Chemical Waste |
||
May 2015 |
29.58 tonnes |
0.00 kg |
0.00 tonnes |
0 L |
June 2015 |
2,218.13 tonnes |
0.00 kg |
9.66 tonnes |
0 L |
Notes: (a) Inert
C&D materials (public fill) include bricks, concrete, building debris,
rubble and excavated spoil. In
total, 2266.14 tonnes of inert C&D material were generated from the
Project. 2256.48 tonnes were disposed as public fill. 9.66 tonnes of general
refuse was disposed as landfill.
The detailed waste flow is presented in Annex F. (b) Non-inert
C&D materials (construction wastes) include metals, paper / cardboard
packaging waste, plastics and other wastes such as general refuse. Metals generated from the Project were
grouped into construction wastes as the materials were not disposed of with
others at the public fill. (c) 0.00
kg of metals, 0.00 kg of papers/ cardboard packing and 0.00 kg of
plastics were sent to recyclers for recycling during the
reporting period. (d) Construction wastes other than
metals, paper/cardboard packaging, plastics and chemicals were disposed of at
NENT Landfill by subcontractors. |
Joint site
inspections were conducted by representatives of the Contractor, the ER, IC and
the ET on 28 May, and 5, 12, 17 and 26 June 2015. The IEC was also
present at the joint inspection on 17 June 2015. Follow-up actions resulting from the last
site inspections were taken as reported by the Contractor and their results
were observed in the site inspections conducted in the reporting period.
Major observations during the reporting period are
summarised as follows:
28 May 2015
¡P
The
discharge point is not yet covered properly. It is recommended to place sand bags
around the discharge point or cover the discharge point to avoid untreated
wastewater run-off.
¡P
The
sedimentation tank was observed to be full after raining and the untreated
water in the sedimentation tank was discharged onto the site without passing
through the WetSep for treatment. It is recommended to recirculate the
untreated water back to the sump pit and stop pumping water to the
sedimentation tank from sump pit when the WetSep is
shut down for emergency or maintenance purpose.
¡P
General
refuse and debris was observed within the tree protection zone of Trees T40,
T41 and T44. It is recommended to
clear general refuse near the trees (T40, 41 and T44) and provide toolbox talk
to all workers on tree protection measures.
¡P
The
tree trunk of Trees T40, T41 and T44 was observed to be tied too tight by
plastic strips. It is recommended
to loosen ropes and plastic strips and avoid tying around the trees.
¡P
No
protection zone was set up for trees T43 and T44 within the site. It is recommended to fence off the
identified trees to block the access to the identified trees.
¡P
Wire
was observed to be hanged on the branches of Tree T44. It is recommended to remove wires and
avoid hanging any materials on the tree.
5 June 2015
¡P
Pond
water is found in the tray under the chemical container. It is recommended to clear
the pond water regularly, especially after raining.
12 June 2015
¡P
Pond
water is found in some areas such as areas near vehicle washing facilities,
parking area, on tarpaulin sheets and in the U-channel. It is recommended to
clear the pond water regularly, especially after raining. Pond water is found
in the cop of an excavator. It is recommended to check if there is any pond
water regularly, especially after raining. It is also recommended to turn it
upside down to prevent pond water.
¡P
Pond
water is found in drip trays. It is recommended to clear the pond water
regularly, especially after raining.
¡P
Drip
tray is missing for some of the chemical containers. It is recommended to
provide drip tray under every chemical containers, even if the chemical are
recently arrived to avoid chemical leakage.
17 June 2015
¡P
A
single chemical container without a drip tray is found. It is recommended to
provide drip tray under every chemical containers, and to place the same type
of chemical in the same area.
¡P
Exposed
area is found to be dry and dusty. It is recommended to spray water regularly
to prevent dry and dusty situation.
26 June 2015
¡P
Soil
is found to be not completely covered by tarpaulin. It is recommended to fully
cover it to prevent dry and dusty situation.
¡P
Drip
tray is missing for some of the chemical containers. It is recommended to
provide drip tray under every chemical containers, even if the chemical are
recently arrived to avoid chemical leakage.
¡P
General
refuse is found in a tank. It is
recommended to provide general refuse point in AD Plant Tank area.
¡P
Pond
water is found in drip trays. It is
recommended to clear the pond water regularly, especially after raining
In accordance with the EM&A Manual, bi-weekly
landscape and visual inspection is required to
ensure that the design, implementation and maintenance of landscape and visual
mitigation measures recommended in the EIA Report are fully achieved. An onsite inspection of the landscape and
visual mitigation measures was performed on 5 and 17 June 2015.
Follow-up actions resulting
from the last site inspections were taken as reported by the Contractor and
their results were observed in the site inspections conducted in the reporting
period.
It was confirmed that most
of the necessary
landscape and visual mitigation measures as summarised in Annex E were
implemented by the Contractor.
The major findings are summarised as follows:
5 June 2015
Item |
Observation &
Recommendation |
Photo Record |
1. |
The tree trunk of Tree T10 was observed to be tied too tight by
plastic strips. It is recommended
to loosen ropes and plastic strips and avoid tying around the trees. |
(T10) |
2. |
A branch of a tree outside the site boundary is found to be tied
around the trunk of Tree T11. It is recommended to loosen ropes and plastic
strips and avoid unwanted tying around the trees. |
(T11) |
3. |
Name tag for tree T43 is lost.
It is recommended to fence off the identified tree to block the access
to the identified trees and tag the tree properly. |
(T43) |
4. |
Trees at the
northern site boundary are tagged properly and a fence is erected to separate
the trees and the site office.
However, to give a clear indication on protecting those trees, it is
recommended to provide a ¡§Tree Protection Zone¡¨ sign on the fence to restrict
the access to the trees. |
N/A |
17 June 2015
No observation is recorded.
No non-compliance
event was recorded during the reporting period.
Works
to be undertaken for the coming monitoring period are summarised in Table 8.1.
Table 8.1 Construction
Works to be undertaken in the Next Reporting Period
Construction Activities Undertaken |
|
¡P
Piling ¡P
Removing Topsoil
from Building 2 ¡P
Foundation Footing
of Tower Crane |
Potential
environmental impacts arising from the above construction activities will be
mainly associated with dust, construction noise, site runoffs, waste management
and landscaping issues.
The
most up-to-date construction programme for the Project is presented in Annex C.
This
EM&A Report presents the EM&A programme undertaken during the reporting
period from 21 May 2015 to 30 June 2015 in accordance with EM&A
Manual and requirements of EP (FEP-01/395/2010/B).
No
air quality, noise and water quality monitoring is required.
Bi-weekly landscape and visual monitoring was
conducted in the reporting period.
Most of the necessary landscape and visual mitigation measures
recommended in the EIA Report were implemented by the Contractor. Follow-up actions are required by the
Contractor to improve protection of the retained or to-be transplanted trees.
No non-compliance event was recorded during the
reporting period.
No
complaint and summons/prosecution was received during the reporting period.
The
ET will keep track of the EM&A programme to ensure compliance of environmental
requirements and the proper implementation of all the necessary mitigation
measures in the coming periods.